Buffer Time Analysis in Construction Project scheduling with Critical Chain Project Management (CCPM) Method

Suranata, Putu and Jawat, I and Laksmi, Ida Ayu and Dharmastika, I Gusti Agung (2025) Buffer Time Analysis in Construction Project scheduling with Critical Chain Project Management (CCPM) Method. In: Proceedings of the 3rd Warmadewa International Conference on Science, Technology, and Humanity, WICSTH 2023, 27-28 October 2023, Denpasar-Bali, Indonesia.

[thumbnail of 72226.pdf] PDF
72226.pdf

Download (417kB)

Abstract

Construction project scheduling plays the most important role because here you can find out how far the project is late or early so you can know the planned and actual progress of a project. In scheduling construction projects, the estimated time of an activity is basically the time span required to

Item Type: Conference or Workshop Item (UNSPECIFIED)
Date Deposited: 04 Mar 2026 18:32
Last Modified: 16 Apr 2026 21:22
URI: http://eprints.eai.eu/id/eprint/52894

Actions (login required)

View Item
View Item