Identification of Key Factors in Construction Progress of Undercrossing Existing Railway Lines under Frame Bridges

Zheng, Xiaofang and Li, Xiaozhong (2024) Identification of Key Factors in Construction Progress of Undercrossing Existing Railway Lines under Frame Bridges. In: Proceedings of the 4th International Conference on Public Management and Intelligent Society, PMIS 2024, 15–17 March 2024, Changsha, China.

[thumbnail of 62571.pdf] PDF
62571.pdf

Download (685kB)

Abstract

Firstly, based on the model of "Driving force-State-Response" (DSR), take the construction parameters as the driving force indicators, the construction progress as the state indicators, and the construction progress enhancement measures as the response indicators, and construct the construction prog

Item Type: Conference or Workshop Item (UNSPECIFIED)
Date Deposited: 04 Mar 2026 17:37
Last Modified: 16 Apr 2026 23:32
URI: http://eprints.eai.eu/id/eprint/49158

Actions (login required)

View Item
View Item