Time And Cost Optimization with The Integration of Building Information Modeling (BIM) 4D and Time Cost Trade-Off Methods (Case Study: Pemali Bridge Project)

Napitupulu, Danniel and Asa, M. and Adriana, Ranny (2023) Time And Cost Optimization with The Integration of Building Information Modeling (BIM) 4D and Time Cost Trade-Off Methods (Case Study: Pemali Bridge Project). In: Proceedings of the International Conference on Sustainable Engineering, Infrastructure and Development, ICO-SEID 2022, 23-24 November 2022, Jakarta, Indonesia.

[thumbnail of 58301.pdf] PDF
58301.pdf

Download (236kB)

Abstract

Time and cost are highly calculated factors as indicators of project success. The presence of the COVID-19 pandemic has had an impact on the process of completing the Pemali Bridge project, a part of the Brebes-Tegal North Ring Road Project, which has stalled for many years. On this study, time and

Item Type: Conference or Workshop Item (UNSPECIFIED)
Date Deposited: 04 Mar 2026 16:59
Last Modified: 17 Apr 2026 01:17
URI: http://eprints.eai.eu/id/eprint/46339

Actions (login required)

View Item
View Item