Liu, Wenjing and Lu, Shichang (2023) Optimization of Automotive Wire Harness Production Process Based on Lean Manufacturing. In: Proceedings of the 2nd International Conference on Engineering Management and Information Science, EMIS 2023, February 24-26, 2023, Chengdu, China.
54455.pdf
Download (1MB)
Abstract
In order to solve the problems of long working hours, complex workflow, and long turnaround time, we applied the lean production concept to the assembly line of our main product, A9815086 automotive wiring harness. The IE method was used to analyze and optimize the production process of the automot
| Item Type: | Conference or Workshop Item (UNSPECIFIED) |
|---|---|
| Date Deposited: | 04 Mar 2026 16:21 |
| Last Modified: | 17 Apr 2026 02:57 |
| URI: | http://eprints.eai.eu/id/eprint/43451 |
