Eswanto, Eswanto (2023) Picohydro Scale Power Plant Pilot Project Utilizing Limited Water Flow as Renewable Energy. In: Proceedings of the 4th Annual Conference of Engineering and Implementation on Vocational Education, ACEIVE 2022, 20 October 2022, Medan, North Sumatra, Indonesia.
53668.pdf
Download (724kB)
Abstract
Until now, the energy needs of all countries have started to run out and each country is competing to find alternative energy sources as a substitute for energy sources for future needs. In Indonesia, as an archipelagic country with many rivers, it is actually easy to get an environmentally friendly
| Item Type: | Conference or Workshop Item (UNSPECIFIED) |
|---|---|
| Date Deposited: | 04 Mar 2026 16:11 |
| Last Modified: | 17 Apr 2026 03:22 |
| URI: | http://eprints.eai.eu/id/eprint/42678 |
