Anggraini, Dewi and Fajri, Mhd and Islami, Syaifuddin and Sapitri, Riri (2018) The involvement of Bundo Kanduang in Conflict Resolution Process of Padang – Sicincin Toll Road Construction Segment 4.2 – 36 KM. In: Proceedings of the 1st International Conference on Gender, Culture and Society, ICGCS 2021, 30-31 August 2021, Padang, Indonesia.
49203.pdf
Download (170kB)
Abstract
President Joko Widodo inaugurated the construction of Padang-Pekanbaru Toll Road on February 9, 2018. Overall, this toll road consists of 5 sections, namely section 1 Padang-Sicincin has a length of 28 km, after the change of section to 36 km, section 2 Sicincin-Payakumbuh has a length of 78 km, sec
| Item Type: | Conference or Workshop Item (UNSPECIFIED) |
|---|---|
| Date Deposited: | 04 Mar 2026 15:15 |
| Last Modified: | 17 Apr 2026 06:27 |
| URI: | http://eprints.eai.eu/id/eprint/38452 |
