Technical Review of Scheduling and Sequence of Overburden Production PT. Tambang Bukit Tambi

Anggraeni, Charina and Rande, Shilvyanora and Wardana, Novandri and Sidiq, Hidayatullah (2021) Technical Review of Scheduling and Sequence of Overburden Production PT. Tambang Bukit Tambi. In: Proceedings of the 2nd International Conference on Industrial and Technology and Information Design, ICITID 2021, 30 August 2021, Yogyakarta, Indonesia.

[thumbnail of 46528.pdf] PDF
46528.pdf

Download (724kB)

Abstract

Overburden volume at pit 5 PT. Tambang Bukit Tambi site Padang Kelapo is 1,496,925.78 BCM which is located in an area of 10.15 Ha with a disposal distance of 100 – 300 meters. The production target based on the available equipment is 1,483 BCM/hour. The dig-and-load equipment used is the Excavator K

Item Type: Conference or Workshop Item (UNSPECIFIED)
Date Deposited: 04 Mar 2026 14:44
Last Modified: 17 Apr 2026 07:37
URI: http://eprints.eai.eu/id/eprint/36189

Actions (login required)

View Item
View Item