Anggraeni, Charina and Rande, Shilvyanora and Wardana, Novandri and Sidiq, Hidayatullah (2021) Technical Review of Scheduling and Sequence of Overburden Production PT. Tambang Bukit Tambi. In: Proceedings of the 2nd International Conference on Industrial and Technology and Information Design, ICITID 2021, 30 August 2021, Yogyakarta, Indonesia.
46528.pdf
Download (724kB)
Abstract
Overburden volume at pit 5 PT. Tambang Bukit Tambi site Padang Kelapo is 1,496,925.78 BCM which is located in an area of 10.15 Ha with a disposal distance of 100 – 300 meters. The production target based on the available equipment is 1,483 BCM/hour. The dig-and-load equipment used is the Excavator K
| Item Type: | Conference or Workshop Item (UNSPECIFIED) |
|---|---|
| Date Deposited: | 04 Mar 2026 14:44 |
| Last Modified: | 17 Apr 2026 07:37 |
| URI: | http://eprints.eai.eu/id/eprint/36189 |
