Sharma, Parul and K., Sangeetha and Metri, Vithal (2018) Design Approach for CCSDS Complied Command Operation and Frame Operation Procedure for Integrated Spacecraft Checkout. EAI Endorsed Transactions on Cloud Systems.
29399.pdf
Download (2MB)
Abstract
Consultative Committee for Space Data Systems (CCSDS) complied Telemetry and Telecommand Processor’s (TTCP) development was taken up by Spacecraft Checkout Group (SCG) of U. R. Rao Satellite Centre, Indian Space Research Organization (ISRO) as a part of ‘Make in India’ campaign. As SCG is responsibl
| Item Type: | Article |
|---|---|
| Date Deposited: | 04 Mar 2026 11:42 |
| Last Modified: | 12 Apr 2026 06:05 |
| URI: | http://eprints.eai.eu/id/eprint/20410 |
