Hartono, Widi and Handayani, Dewi and Prabowo, Rizky and Dewa, Yoga and Rohadi, Susetyo (2018) Analysis of Girder PCU Subcontractor Selection Method with Analytical Network Process (ANP) (Case Study: Musi IV Bridge Project). In: The 1st International Conference on Computer Science and Engineering Technology Universitas Muria Kudus.
28693.pdf
Download (892kB)
Abstract
Finding capable and reliable sub-contractors is the ideal for the main contractor in completing the project. The project performance of the winning contractor often disappoints the main contractor, indicated by the delay in work, the non-completion of the work, or the quality of work that is below t
| Item Type: | Conference or Workshop Item (UNSPECIFIED) |
|---|---|
| Date Deposited: | 04 Mar 2026 11:35 |
| Last Modified: | 17 Apr 2026 15:21 |
| URI: | http://eprints.eai.eu/id/eprint/19736 |
